AC/DC high voltage test transformer with reasonable design and complete functions 

   AC/DC high voltage test transformer functional advantages:


   1. Full Chinese interface, simple and clear operation, clear and intuitive readings.


   2. Touch panel key operation, all functions can be set via keys.


   3. Adopts fifth-generation IPM dedicated modules, with four sets of data displayed simultaneously on the same screen: voltage, current, protection current, and time setting.


   4. Fully digital voltage boosting, abandoning the traditional voltage regulator boosting method.


   5. Direct key setting of current, voltage, and protection current for convenience and speed.


   6. A single key can easily switch between AC and DC display modes for voltage.


   7. Safe grounding protection function that automatically detects whether the ground wire is securely connected.


   8. Equipped with audible and visual alarm functions, effectively ensuring personal safety. 


   9. Fully computer-controlled time, with arbitrary stop conditions, and settable time range from 1 second to 100 minutes for the AC/DC high voltage test transformer.


   10. Small size and light weight, dozens of times lighter than traditional equipment of the same capacity.


   11. The high-voltage winding is a multi-layer pagoda-shaped trapezoidal structure, and the low-voltage winding is a cylindrical structure, with the shielding and iron core grounded together.


   12. The bottom of the oil tank is equipped with movable casters (no casters for below 5kVA), allowing arbitrary movement on the ground, convenient for laboratory and field operations.


   13. The AC/DC high voltage test transformer is indoor equipment, with the iron core made of cold-rolled grain-oriented silicon steel sheets, structured as core-type, horizontally placed, with low-voltage winding, measuring winding, shielding, and high-voltage winding concentrically mounted on the core column.


   AC/DC high voltage test transformer technical parameters:


   1. Maximum relative humidity of air: when the air temperature is +25°C, the relative humidity does not exceed 90%.


   2. When using the AC/DC high voltage test transformer, the input voltage should be increased gradually, and reliable protective measures should be in place.


   3. Power supply voltage waveform: the waveform of the power supply voltage should be a practical sine wave with a frequency of 50Hz, and the power supply side should not be subjected to external atmospheric overvoltages.


   4. Installation site: The installation site for the AC/DC high voltage test transformer should be free of gases, vapors, chemical dust deposits, dirt, and other explosive media that seriously affect the transformer insulation, as well as places with severe vibration.