High Voltage Switch Energization Test Device - Production PriceTechnical Conditions:
Input Power: Three-phase four-wire AC 380V
Output Voltage and Current:
1. Three-phase AC 0 – 10A output (<100V, adjustable) one group
2. Three-phase AC100V output (fixed value) one group
3. AC operation voltage output AC 0~400V, at 220V, current less than 10A
4. DC operation voltage output DC 0~260V
5. DC closing power supply output DC 0~300V (rated current 100A, short-time working current 300A) one group
6. Single-phase AC220V output (fixed value, socket form) two groups,
7. Three-phase AC380V output (fixed value, terminal) one group,
8. Dimensions: 560*520*850mm
9. Weight: 45kg
High Voltage Switch Energization Test Device - Production PriceSafety Technical Operation Regulations:
1. When working on panels that are fully or partially energized, the equipment under maintenance should be clearly marked to distinguish it from operating equipment. [1]
2. When performing work with significant vibration, such as drilling on protection panels, measures should be taken to prevent the operating equipment from tripping.
3. The secondary windings of all current transformers and voltage transformers should have reliable protective grounding.
4. When working on the secondary circuit of a running current transformer, the following safety measures should be taken:
1. It is strictly forbidden to open the current circuit;
2. To reliably short-circuit the secondary winding of the current transformer, short-circuit pieces and short-circuit wires must be used;
3. It is forbidden to perform any work on the circuit and wires between the current transformer and the short-circuit terminal;
4. During work, a dedicated person should supervise, use insulated tools, stand on an insulating mat, and must not disconnect the protective grounding in the circuit.
5. When working on the secondary circuit of a running voltage transformer, the following safety measures should be taken:
1. Strictly prevent short circuit or grounding;
2. Insulated tools should be used, and insulating gloves should be worn. If necessary, the relevant relay protection devices should be deactivated before work;
3. When connecting temporary loads, special switches and fuses must be installed;
4. When conducting energization tests on the secondary circuit, to prevent reverse transformation from the secondary side to the primary side, in addition to disconnecting the secondary circuit, the primary fuse should also be removed;
5. Before energizing or conducting withstand voltage tests on the secondary circuit, the duty personnel and relevant personnel should be notified, and someone should be assigned to guard the site, check the circuit, and confirm that no one is working before applying voltage.
6. Personnel inspecting the trip protection and secondary circuits are not allowed to perform any switching operations without the permission of the duty officer.
Product Aliases:
High and low voltage switchgear energization test bench, energization test bench, high and low voltage complete test bench, switchgear test bench[1]
Operation Instructions:
1. Connect the input power supply AC380V
2. Connect the AC operation voltage output power line to the voltmeter
3. Check and confirm that the wiring is correct, turn on the main power switch 4. Return the voltage regulator to zero, and press the "Close" button,
5. Then press the "Close" button for AC operation voltage on the panel
6. Slowly adjust the output adjustment knob to raise the voltage to the required value, and observe the voltmeter.
7. After the test, first press the "Open" button for AC operation voltage on the panel, then press the main "Open" button on the panel. Then, turn off the main power switch
Usage Instructions
1. Connect three-phase four-wire AC380V
2. Connect the output DC300V to the load
3. Rotate the output adjustment knob counterclockwise to zero