  Investment subsidy: The government provides investment subsidies to eligible enterprise investment projects and investment projects of lower-level local governments. Generally, the government's investment subsidy shall not exceed 30% of the total investment amount.



  Reward: A government incentive policy for enterprises with outstanding performance, excellent achievements, and significant innovative contributions. The reward amount depends on specific circumstances.



  Interest discount: The government provides interest discounts on loans for investment projects that meet the conditions and use medium and long-term bank loans.



  Including ownership nature, sales revenue, profit, taxes, fixed assets, asset-liability ratio, bank credit rating, basic information of the project leader, and overview of major shareholders in the past three years.



  This section mainly explains the background of the project initiation, the necessity of investment, the reasons for investment, and the supporting conditions for project implementation.



  Involving the source of achievements and intellectual property status, completed research and development work, pilot test situation and appraisal year, technical or process characteristics and advantages compared with existing technologies or processes, and the significant importance and role of the breakthrough of this technology in promoting industry technological progress.



  Including environmental protection, comprehensive utilization of resources, energy-saving measures, raw material supply, and implementation of external supporting conditions; among them, the energy-saving analysis chapter is written in accordance with the requirements of the "Notice of the National Development and Reform Commission on Strengthening Energy Conservation Evaluation and Review of Fixed Asset Investment Projects" (Development and Reform Investment [2007] No. 2787). It can be obtained from multiple sources. During the project feasibility study stage, fund raising work is based on the results of fixed asset investment estimation and working capital estimation of the construction project, researching and implementing the sources and methods of funds, and selecting funds with favorable conditions. In the feasibility study report, each source of funds and its raising method should be discussed one by one.



  When evaluating a construction project, most of the data used comes from forecasts and estimates. Due to limited information and data, the actual future situation may differ, which may bring risks to project investment decisions. To avoid or minimize risks, it is necessary to analyze the impact of uncertain factors on the economic evaluation indicators of the project to determine the reliability of the project. This is uncertainty analysis.



  According to different analysis content and emphasis, uncertainty analysis can be divided into break-even analysis, sensitivity analysis, and probability analysis. In feasibility studies, break-even analysis, sensitivity analysis, and probability analysis are generally conducted, depending on the project situation.